Hotel suite with custom rug
Hospitality

Your opening date is fixed. So is ours.

Suites, ballrooms, lobbies and corridors — designed with your interior team, approved on a physical sample, made in one factory.

Beachfront Hotel, Miami
Where hotel projects get stuck

Three things we plan for from day one

Fire approval

US: SGS 16 CFR 1630 report and CRI Green Label Plus, ready to download.
Europe: we test your construction to EN 13501-1 and EN 14041 (CE) at an accredited European lab before production.
Gulf: tested to the standard your approving authority asks for.

Certificates by region →

Colour across rooms

Yarn for each colour is dyed for your project and checked against the approved strike-off, so suite 101 and suite 901 match.

Our dye house →

Fit on site

Hand-tufted carpet can move 1–2% in size. For wall-to-wall areas we add margin and leave open edges so your installer trims to the wall — no carpet that arrives too small.

Sizes & tolerances →
Hotel suite
Areas we make for

From the lobby to the last corridor

  • Lobbies & ballrooms — large inlaid designs, cut pile for a soft, rich surface
  • Corridors — loop or cut-and-loop pile for heavy traffic, borders that turn corners
  • Suites & guest rooms — area rugs in wool or wool-silk blends
  • Staircases — runners shaped to straight and curved stairs
Which yarn for which area
Phased projects

Batch three matches batch one

Renovating floor by floor, or hotel by hotel? Here is how we keep colour consistent across deliveries.

  • One dye lot where possible. We dye yarn for the whole project at once, or reserve it, so later batches come from the same lot.
  • A retained standard. Your signed strike-off and yarn samples stay on file; every batch is checked against them, not against the previous batch.
  • Written tolerance. The colour tolerance for each batch is agreed in your contract before production starts.
  • Packed by area. Each batch is labelled by floor, room type or area to match your installation plan.
Large carpet being finished

Send us your room schedule and opening date.

Start a Project

Staged payments to our company account · Factory faults put right at our cost, as set out in your contract